How to price a bathroom renovation in Switzerland

Cet article n'est pas encore traduit et s'affiche en anglais.

A bathroom is the hardest room in the house to price and the easiest to lose money on. It stacks half a dozen trades into a few square metres, and most of the risk is hidden behind the old tiles. Here's a method that turns "gut feel" into a number you can defend — and a full worked example.

Price the parts, not the room

Never price a bathroom as one lump. Break it into the components that actually drive cost, then add them up:

  1. Strip-out & disposal — labour + skip. Older buildings hide surprises here.
  2. Waterproofing & screed — the part clients never see and never value, but the part that causes callbacks if you skimp.
  3. Tiling — split into labour (per m²) and material (per m², from real supplier prices).
  4. Sanitary suite — WC, basin, shower/bath, taps, priced per unit.
  5. Fit & connections — plumbing and installation labour.
  6. Buffer — a single contingency line that prices the unknowns once.

A worked example

A small guest bathroom, roughly 4 m² floor, 18 m² of tiling:

ComponentBasisCHF
Strip-out & disposal1.5 days1,260
Waterproofing & screed6 m² + consumables820
Tiling — labour18 m²1,980
Tiling — material18 m² @ supplier price1,980
Sanitary suiteWC + basin + shower2,650
Fit & plumbing2 days1,680
Subtotal10,370
Contingency buffer (12%)absorbs the unknowns1,244
Fixed price (excl. VAT)11,614

Illustrative figures for a small bathroom in the Basel region — adapt to your own labour rate and supplier prices. The structure is what matters.

Where jobs actually lose money

  • Under-costing the strip-out. In older Swiss housing stock, what's behind the tiles is the biggest variable. Walk the room, tap the walls, and price for what you might find — that's what the buffer is for.
  • Forgetting the consumables. Adhesive, grout, silicone, waterproofing and screed add up. Cost them by coverage (m²), not by guess.
  • Quoting a range. "Between 10k and 14k" reads as "14k, probably more." One fixed number reads as competence.

Keep it defensible

The reason to build a price up from parts isn't bureaucracy — it's that every line is referenceable. When a customer asks "why so much for the tiling?", you have an answer: labour per m² plus material at the current supplier price. This is also why Mastro cites the live supplier price and article number on each material line — a price you can point to beats a price you have to defend.

Price the parts, buffer the unknowns once, and give one fixed number. Do that and your quotes stop being a gamble and start being a competitive advantage.

Related: how pricing and buffers work · fixed-price vs hourly estimates.

À lire aussi

Communications

WhatsApp for tradespeople: turning chats into booked jobs

How to run WhatsApp like a professional channel — templates, habits, and keeping chats tied to the job.

Winning work

The first tradesperson to reply usually wins — here's a follow-up system that takes 10 minutes to set up

A copy-paste follow-up cadence — timings and message templates — so leads stop going cold.